Freshwater Place, Melbourne

  • 30 m overburden over HW to SW siltstone (variable)
  • ~ 70 x 1.2 m diameter piles (plus others)
  • serviceability loads of 17 MN to 30 MN
  • design top-of-socket settlement : 1 % diameter

Estimated Savings

  • 900 m in socket length
  • 1000 m3 of concrete
  • 1500 m3 reduction in spoil
  • $1m saving plus 40 days of construction time

Additional Cost

  • $20k in site investigation and design
  • minimal $ for on-site works (logging and design)




For further information or general project advice please contact Dr. Julian Seidel of Foundation QA.